The Installation Of The High Tower Washing Powder Production Line With An Annual Output Of 30,000 Tons In Zambia Is Progressing Smoothly

- Jan 18, 2021-

The complete set of production line designed and constructed by the company with an annual output of 30,000 tons of tower washing powder has successfully arrived in Zambia, and the installation work has been in full swing. Both parties have overcome the adverse effects of the epidemic, carefully planned, strengthened epidemic prevention, and rationally organized construction to ensure the smooth progress of installation work.

Tank farm